saum toj kawg nkaus
Working principle of dual cut power switch

 

The working principle of STS is based on the demand for power switching. When the main power supply fails or fails, STS can automatically switch the load from the main power supply to the backup power supply to maintain continuous power supply. The main steps include: 1 Monitoring: STS will continuously monitor the status of the main power supply, including parameters such as voltage, zaum, phase, thiab lwm yam. 2. Fault detection: When STS detects a fault in the main power supply or does not meet the preset working range, it will immediately respond. 3. Switching decision: STS determines whether power switching is necessary based on the fault detection results. 4. Switching operation: If it is determined that switching is necessary, STS will control the switching process. It will disconnect the main power supply and ensure that the backup power supply is ready, then connect the load to the backup power supply. 5. Switching completed: Once the switching is completed, STS will monitor the status of the backup power supply to ensure it can provide power normally. Collaboration with UPS

Sau ntawv cia

Koj qhov chaw nyob yuav tsis muab luam tawm. Yuav tsum tau teb yog cim *

Sib tham nrog kristin
Twb 1902 hais lus

  • kristin 10:12 AM, Hnub no
    Zoo siab tau txais koj cov lus, thiab qhov no yog kristin reponse rau koj